BRIDON WIRE - DONCASTER
Bridon Wire had a project to install a new cooling tower system at their site in Doncaster. They required a full system control panel to control both the pumps and cooling tower fans. GT Electrical in consultation with Bridon wire, designed a full system control panel, which incorporated VSD control on both pumps and cooling tower fans. The panel also incorporated a control logic via a flow meter to cope with the varying water flows used in their cooling system. This controls the opening and closing of the valves on each cell of the cooling tower.
This project tender was won by spending time with the client, understanding their requirements and providing them with a cost effective solution that gave them a fully automatically controlled water cooling system.